|
From: | Jonathan Prouty |
Subject: | Re: [Therion] Surveying Maze Caves |
Date: | Sat, 2 Dec 2006 10:19:33 -0500 |
On 25.11.2006, at 17:56, Jonathan Prouty wrote:
> Any advice would be greatly appreciated.
One more thing:
usually you need to draw several subtypes of line wall - bedrock,
blocks, presumed, etc.
There is not the best way how to do it if you start with new line
each time the subtype of wall line changes.
Try to use to change subtype of wall as change of line point subtype
instead. Keep the line wall in one piece if possible - the automatic
joining of wall lines will work much better.
Martin
_______________________________________________
Therion mailing list
address@hidden
http://www.speleo.sk/mailman/listinfo/therion
_______________________________________________ Therion mailing list address@hidden http://www.speleo.sk/mailman/listinfo/therion
[Prev in Thread] | Current Thread | [Next in Thread] |