[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
[O] TODOs in the agenda?
From: |
Sharon Kimble |
Subject: |
[O] TODOs in the agenda? |
Date: |
Sat, 29 Mar 2014 21:46:36 +0000 |
User-agent: |
Gnus/5.13 (Gnus v5.13) Emacs/24.3 (gnu/linux) |
I have a document called 'organiser.org' which is mainly comprised of various
TODOs under various projects, and various NEXT under birthdays and hospital
appointments. These TODOs can be up to 4 levels in depth, and with one level 1
TODO as the project header. How can all of these TODOs be included in the agenda
please?
Here is one example -
,----
| * Jobs to do [53%] [8/15]
| ** TODO eat breakfast
`----
and another -
,----
| ** Gnus setup [5/6] [83%]
| *** DONE set up gnus for localhost email
| CLOSED: [2014-03-25 Tue 16:57]
| *** DONE set up gnus for gmail
| CLOSED: [2014-03-25 Tue 16:57]
| *** TODO get bbdb working with gnus
`----
And the whole document is like that, several projects with loads of TODOs
within them, but how do I get them all showing in the agenda please?
Thanks
Sharon.
--
A taste of linux = http://www.sharons.org.uk
my git repo = https://bitbucket.org/boudiccas/dots
TGmeds = http://www.tgmeds.org.uk
Debian testing, Fluxbox 1.3.5, emacs 24.3.1
- [O] TODOs in the agenda?,
Sharon Kimble <=