gnunet-svn
[Top][All Lists]
Advanced

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

[taler-anastasis] 02/02: Merge branch 'master' of ssh://git.taler.net/an


From: gnunet
Subject: [taler-anastasis] 02/02: Merge branch 'master' of ssh://git.taler.net/anastasis
Date: Thu, 11 Jun 2020 00:28:18 +0200

This is an automated email from the git hooks/post-receive script.

dennis-neufeld pushed a commit to branch master
in repository anastasis.

commit 74ae5fb8abe0b3c274285af6f337f2616b127b85
Merge: 453e714 76a83d3
Author: Dennis Neufeld <dennis.neufeld@students.bfh.ch>
AuthorDate: Wed Jun 10 22:27:14 2020 +0000

    Merge branch 'master' of ssh://git.taler.net/anastasis

 doc/thesis/Journal.tex                | 72 ++++++++++++++++++-----------------
 doc/thesis/business_model.tex         | 47 ++++++++++++++---------
 doc/thesis/client_architecture.tex    |  4 +-
 doc/thesis/design.tex                 |  4 +-
 doc/thesis/implementation.tex         | 10 ++---
 doc/thesis/rest_api_documentation.tex | 44 ++++++++++-----------
 doc/thesis/thesis.tex                 | 11 +++---
 7 files changed, 104 insertions(+), 88 deletions(-)

diff --cc doc/thesis/Journal.tex
index 9d0a41a,5e81833..cae941e
--- a/doc/thesis/Journal.tex
+++ b/doc/thesis/Journal.tex
@@@ -1,15 -1,16 +1,16 @@@
- \title{Anastasis work journal}
- \date{\today}   %% or \date{01 november 2018}
- \author{Dominik Meister (\texttt{dominiksamuel.meister@students.bfh.ch}) \\
-   Dennis Neufeld (\texttt{dennis.neufeld@students.bfh.ch })}
- \maketitle
- \clearpage
+ %\title{Anastasis work journal}
+ %\date{\today}   %% or \date{01 november 2018}
+ %\author{Dominik Meister (\texttt{dominiksamuel.meister@students.bfh.ch}) \\
+ %  Dennis Neufeld (\texttt{dennis.neufeld@students.bfh.ch })}
+ %\maketitle
+ %\clearpage
+ 
  \section{Work journal}
  \section*{Meeting 20.02.2020}
 -Present at the Meeting were:"Dominik Meister, Dennis Neufeld and Christian 
Grothoff".
 +Present at the Meeting were: Dominik Meister, Dennis Neufeld and Christian 
Grothoff.
  \subsection*{Reflection}
- It was the first meeting of the Bachelor's thesis. The main focus lied on the 
planing of the project and discussing the next steps. 
- The conclusion was there is alot of work to do and we need to focus from the 
beginning.
+ It was the first meeting of the Bachelor's thesis. The main focus was on the 
planing of the project and discussing the next steps.
+ The conclusion was there is a lot of work to do and we need to focus from the 
beginning.
  \subsection*{Next Steps}
  The next meeting will be at the 27.2. Until this meeting drafts of several 
project documents should be completed. Task schedule, project document, work 
journal, business plan, abstract, motivation. Additionaly a draft for the 
BRIDGE funding proposal should be written.
  
@@@ -21,9 -22,9 +22,9 @@@ The main topic of the meeting was the B
  The next steps are the completion of the BRIDGE proposal.
  
  \section*{Meeting 05.03.2020}
 -Present at the Meeting were:"Dominik Meister, Dennis Neufeld and Christian 
Grothoff".
 +Present at the Meeting were: Dominik Meister, Dennis Neufeld and Christian 
Grothoff.
  \subsection*{Reflection}
- In this meeting the main topic was the finalization of the BRIDGE proposal. 
We also discussed the related work and Business model of Anastasis. 
+ In this meeting the main topic was the finalization of the BRIDGE proposal. 
We also discussed the related work and Business model of Anastasis.
  Through the extensive work on the BRIDGE proposal the development has not 
continued very fast. But we already could write key parts for the Bachelor 
thesis.
  \subsection*{Next Steps}
  Next is the completion and delivery of the BRIDGE proposal.
@@@ -44,26 -45,26 +45,26 @@@ We also have made some design mistakes 
  Completion of the Anastasis Client API tests and continue on the 
implementation of the crypto library.
  
  \section*{Meeting 26.03.2020}
 -Present at the Meeting were:"Dominik Meister, Dennis Neufeld and Christian 
Grothoff".
 +Present at the Meeting were: Dominik Meister, Dennis Neufeld and Christian 
Grothoff.
  \subsection*{Reflection}
  We ran into alot of problems and decided to make more frequent meetings. We 
need to fix some design issues, the imports
- of the different files are done wrong. Additionaly we need to be more clear 
with the names. 
+ of the different files are done wrong. Additionaly we need to be more clear 
with the names.
  We need to focus more on the implementation and be more precise with the 
documentation.
  \subsection*{Next Steps}
  Implementation of the Crypto library, fix issues mentioned.
  
  \section*{Meeting 30.03.2020}
 -Present at the Meeting were:"Dominik Meister, Dennis Neufeld and Christian 
Grothoff".
 +Present at the Meeting were: Dominik Meister, Dennis Neufeld and Christian 
Grothoff.
  \subsection*{Reflection}
- We could fix the issues from the last meetings and are now in the development 
of the crypto library. 
+ We could fix the issues from the last meetings and are now in the development 
of the crypto library.
  We had some problems with pointers which we could discuss and fix. We are 
happy that we can see progress.
  \subsection*{Next Steps}
  Implementation of the Crypto libarary, finishing API.
  
  \section*{Meeting 02.04.2020}
 -Present at the Meeting were:"Dominik Meister, Dennis Neufeld and Christian 
Grothoff".
 +Present at the Meeting were: Dominik Meister, Dennis Neufeld and Christian 
Grothoff.
  \subsection*{Reflection}
- Dennis is still fixing issues with the API communication, the process is very 
time consuming and 
+ Dennis is still fixing issues with the API communication, the process is very 
time consuming and
  we are pretty behind. Dominik was sick for some days and was not able to work 
for the project. We are now
  pretty behind our task schedule and need to work harder.
  \subsection*{Next Steps}
@@@ -103,11 -104,11 +104,11 @@@ it is a very complex part which needs t
  Finish Crypto library testing, implementation anastasis client
  
  \section*{Meeting 24.04.2020}
 -Present at the Meeting were:"Dominik Meister, Dennis Neufeld and Christian 
Grothoff".
 +Present at the Meeting were: Dominik Meister, Dennis Neufeld and Christian 
Grothoff.
  \subsection*{Reflection}
  We still have some bugs in the crypto library. We should focus that the 
application
- is not crashing if something unexpected happens, the application should 
continue. 
- Additionaly there were some security issues in the code we need to fix. 
+ is not crashing if something unexpected happens, the application should 
continue.
+ Additionaly there were some security issues in the code we need to fix.
  The development of this component is very complex and needs a lot of time, we
  hope that we soon can finish the crypto library. Also the development of the 
Anastasis
  client is finished we can now start with the testing.
@@@ -144,10 -145,10 +145,10 @@@ We also still have some issues with ou
  Finish implementation anastasis client tests and authentication backend
  
  \section*{Meeting 07.05.2020}
 -Present at the Meeting were:"Dominik Meister, Dennis Neufeld and Christian 
Grothoff".
 +Present at the Meeting were: Dominik Meister, Dennis Neufeld and Christian 
Grothoff.
  \subsection*{Reflection}
  We could finish the authentication backend and now need to implement the 
client logic for the authentication.
- We also need to finish the client tests. We have roughly one month left to 
finish the project, we started to 
+ We also need to finish the client tests. We have roughly one month left to 
finish the project, we started to
  think that we can't develop a complex authentication method. We planned that 
we first will finish the rest
  and afterwards look if we have time to implement a different authentication 
method.
  \subsection*{Next Steps}
@@@ -163,20 -164,25 +164,25 @@@ complex authentication method
  Finish client api and tests
  
  \section*{Meeting 14.05.2020}
 -Present at the Meeting were:"Dominik Meister, Dennis Neufeld and Christian 
Grothoff".
 +Present at the Meeting were: Dominik Meister, Dennis Neufeld and Christian 
Grothoff.
  \subsection*{Reflection}
- Something unexpected happened this week. We applied for funding last semester 
and were rejected. 
- But we were informed that we can still present our work. Therefore we have to 
prepare a business 
- pitch in the next few days. This will be quite stressfull since we are also 
behind in our development.
+ %Something unexpected happened this week. We applied for funding last 
semester and were rejected.
+ %But we were informed that we can still present our work. Therefore we have 
to prepare a business
+ %pitch in the next few days. This will be quite stressfull since we are also 
behind in our development.
+ We are still behind in our development.
+ Nevertheless, industry interest suggests we should prepare a business pitch.
+ 
  \subsection*{Next Steps}
- Prepare business pitch and finish client api
+ %Prepare business pitch and
+ finish client api
  
  \section*{Meeting 18.05.2020}
 -Present at the Meeting were:"Dominik Meister, Dennis Neufeld and Christian 
Grothoff".
 +Present at the Meeting were: Dominik Meister, Dennis Neufeld and Christian 
Grothoff.
  \subsection*{Reflection}
  The last couple of days were quite stressfull but we manged to complete the 
Anastasis client tests. This
- means our application flow is working. This is a huge relief. We also have to 
finish the business pitch which is held
- tomorow.
+ means our application flow is working. This is a huge relief.
+ %We also have to finish the business pitch which is held
+ %tomorow.
  \subsection*{Next Steps}
  Finish business pitch, start developing Anastasis CLI, write bachelor book, 
create bachelor poster
  
@@@ -190,39 -196,35 +196,35 @@@ Both of these still need some adjustmen
  Finish Anastasis splitter and assembler, start to finish documentation, fix 
book and poster
  
  \section*{Meeting 28.05.2020}
 -Present at the Meeting were:"Dominik Meister, Dennis Neufeld and Christian 
Grothoff".
 +Present at the Meeting were: Dominik Meister, Dennis Neufeld and Christian 
Grothoff.
  \subsection*{Reflection}
  We nearly could finish the Anastasis CLI and can now start to focus on the 
documentation.
- We already have a lot of documentation available which needs to be put 
togheter in one document. We also succeded in the
- proposal we sent, we are very happy that we can continue our work on 
Anastasis after the thesis.
- Additionaly the Book and the poster are finished and we could deliver them.
+ We already have a lot of documentation available which needs to be put 
together in one document.
+ %We also succeded in the proposal we sent, we are very happy that we can 
continue our work on Anastasis after the thesis.
+ Additionaly the book abstract and the poster are finished and we could 
deliver them.
  \subsection*{Next Steps}
- Work on documentation 
+ Work on documentation
  
  \section*{Meeting 04.06.2020}
 -Present at the Meeting were:"Dominik Meister, Dennis Neufeld and Christian 
Grothoff".
 +Present at the Meeting were: Dominik Meister, Dennis Neufeld and Christian 
Grothoff.
  \subsection*{Reflection}
- There is only one week left, our document is nearly finished. We discussed 
which last sections need to be added. The thesis overall is now in a nearly 
finished state, there are some minor problems with the illustrutions and the 
text which should be easy fixed. 
+ There is only one week left, our document is nearly finished. We discussed 
which last sections need to be added. The thesis overall is now in a nearly 
finished state, there are some minor problems with the illustrutions and the 
text which should be easy fixed.
  
  \subsection*{Next Steps}
  Fix illustrations, rework client client documentation
  
  \section*{Meeting 08.06.2020}
 -Present at the Meeting were:"Dominik Meister, Dennis Neufeld and Christian 
Grothoff".
 +Present at the Meeting were: Dominik Meister, Dennis Neufeld and Christian 
Grothoff.
  \subsection*{Reflection}
- This is the second last meeting of our thesis. We discussed the last changes 
which need to be done. The text is completed, we decided that we could add more 
illustrations to give a better understanding of the document. We are very proud 
of our work and think that we have done a good job. 
+ This is the second last meeting of our thesis. We discussed the last changes 
which need to be done. The text is completed, we decided that we could add more 
illustrations to give a better understanding of the document. We are very proud 
of our work and think that we have done a good job.
  \subsection*{Next Steps}
  Add illustrion for key flow, rework some minor inconsitencies
  
  \section*{Meeting 11.06.2020}
 -Present at the Meeting were:"Dominik Meister, Dennis Neufeld and Christian 
Grothoff".
 +Present at the Meeting were: Dominik Meister, Dennis Neufeld and Christian 
Grothoff.
  \subsection*{Reflection}
  We mainly discussed what still needs to be done in the Anastasis 
documentation. We discovered that the related work
- has not enough details and needs some more work. Also in the business model 
were some small problems. The work on 
- the documentation progresses very quick, it also has to since we dont have 
much time left.
+ has not enough details and needs some more work. Also in the business model 
were some small problems. The work on
+ the documentation progresses very quickly --- it also has to since we don't 
have much time left.
  \subsection*{Next Steps}
  Work on documentation
- 
- 
- 
- 

-- 
To stop receiving notification emails like this one, please contact
gnunet@gnunet.org.



reply via email to

[Prev in Thread] Current Thread [Next in Thread]