guix-patches
[Top][All Lists]
Advanced

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

[bug#72362] [PATCH 2/2] guix: tests: Increase timeout for test store con


From: Christopher Baines
Subject: [bug#72362] [PATCH 2/2] guix: tests: Increase timeout for test store connection.
Date: Tue, 30 Jul 2024 21:19:36 +0100

THe gexp->derivation, store copy test involves building derivations which
compile a bunch of Guile code, which can be quite slow on slow platforms like
riscv64-linux.

* guix/tests.scm (open-connection-for-tests): Increase #:timeout to 10
minutes.

Change-Id: Iccfd976ce21a8902d776b36f17f5fb91b957d90d
---
 guix/tests.scm | 4 ++--
 1 file changed, 2 insertions(+), 2 deletions(-)

diff --git a/guix/tests.scm b/guix/tests.scm
index 8f6d040f1f..5a314eb395 100644
--- a/guix/tests.scm
+++ b/guix/tests.scm
@@ -86,11 +86,11 @@ (define* (open-connection-for-tests #:optional (uri 
(%daemon-socket-uri)))
              #f))
     (let ((store (open-connection uri)))
       ;; Make sure we build everything by ourselves.  When we build something,
-      ;; it should take at most 5 minutes.
+      ;; it should take at most 10 minutes.
       (set-build-options store
                          #:use-substitutes? #f
                          #:substitute-urls (%test-substitute-urls)
-                         #:timeout (* 5 60))
+                         #:timeout (* 10 60))
 
       ;; Use the bootstrap Guile when running tests, so we don't end up
       ;; building everything in the temporary test store.
-- 
2.45.2






reply via email to

[Prev in Thread] Current Thread [Next in Thread]