[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
[bug#73288] Request for merging "mesa-updates" branch
From: |
Steve George |
Subject: |
[bug#73288] Request for merging "mesa-updates" branch |
Date: |
Thu, 3 Oct 2024 09:56:17 +0100 |
User-agent: |
Mozilla Thunderbird |
Hi,
On 02/10/2024 21:53, Sharlatan Hellseher wrote:
(...)
The current queue of branches awaiting for review and merge:
| 71408 | python-team | Fri Jun 07 10:55:25+0200 2024 | Done |
| 72959 | fonts-split-outputs | Mon Sep 02 12:55:25+0200 2024 | Open |
| 73104 | r-team | Sat Sep 07 17:55:24+0200 2024 | Open |
| 73288 | mesa-updates | Mon Sep 16 04:38:25+0200 2024 | Open |
| 73502 | go-team | Thu Sep 26 23:40:25+0200 2024 | Open |
| 73515 | qt-team | Fri Sep 27 14:46:24+0200 2024 | Open |
| 73558 | wip-gsl-upgrade | Sun Sep 29 22:33:24+0200 2024 | Open |
| 73567 | lisp-team | Mon Sep 30 15:43:28+0200 2024 | Open |
(...)
- https://qa.guix.gnu.org/branch/r-team
#73104 I've pinged R team members if that branch may be merged, the
changes touch just R packages from CRAN and Bioconductor. QA passed.
(...)
What's the definition of when a branch looks good for merging? Does some
% of substitutes have to be achieved, and for which architectures?
https://qa.guix.gnu.org/branch/r-team shows 96% for x86_64 which is .4 %
higher than current master [0]. So it's a win by merging it! ;-)
Seriously, it's also at 96% for aarch64-linux (bordeaux). So "it looks
good to me".
If that's the case, what prevents this "just" being merged?
Presumably r-team demonstrated their desire for it to be merged by
opening the merge request ticket. Is it a break in process if someone
else does it? (rather than waiting for them to respond).
- https://qa.guix.gnu.org/branch/mesa-updates
#73288 I'd love to have that branch merged, it would help to pack more
projects for Astro* soft =).
https://qa.guix.gnu.org/branch/mesa-updates doesn't look as good to me.
Fine on x86_64, but aarch64-linux is lower than master. Unsure if this
is due to the build farms still trying to catch-up?
- https://qa.guix.gnu.org/branch/go-team
#73502 I've rebased it recently and pushed again it looks like most of
the major builds passed successfully, some architectures (aarch64) are
lagged behind. The branch is ready and would let me complete packaging
Prometheus and start large unbundle task.
This looks about the same as Mesa-upates to me.
Is there a way to compare master<-->go-team to see if different packages
are failing?
We shouldn't make master break in new ways by merging right!
Steve / Futurile
[0] https://qa.guix.gnu.org/branch/master