|
From: | Nitin Patel |
Subject: | [Help-glpk] Stock Cutting problem |
Date: | Sat, 9 Mar 2013 22:37:00 +0530 |
How to solve stock cutting problem with multiple length stock available and demand is under. Stock length available--- 15 m – 3 Numbers 10 m – 3 Numbers Demand--- 7m – 3 Numbers 6m – 2 Numbers 4m – 6 Numbers 3m – 1 Number How to solve it so that minimize wastage We should utilize minimum number of stocks If unused length is more than 0.5 m then we can utilize it for next cutting schedule and it is not wastage. Thanks Nitin patel |
[Prev in Thread] | Current Thread | [Next in Thread] |