[Top][All Lists]
[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
[Phpgroupware-tracker] [Bug #475] Calendar planner locks up (or takes to
From: |
nobody |
Subject: |
[Phpgroupware-tracker] [Bug #475] Calendar planner locks up (or takes too long) in viewing a group's schedule |
Date: |
Sat, 31 Aug 2002 11:50:53 -0400 |
=================== BUG #475: LATEST MODIFICATIONS ==================
http://savannah.gnu.org/bugs/?func=detailbug&bug_id=475&group_id=509
Changes by: Ralf Becker <address@hidden>
Date: 2002-Aug-31 17:50 (Europe/Berlin)
What | Removed | Added
---------------------------------------------------------------------------
Assigned to | None | ralfbecker
=================== BUG #475: FULL BUG SNAPSHOT ===================
Submitted by: alexbsa Project: phpGroupWare
Submitted on: 2002-May-28 15:57
Category: calendar Bug Group: 0.9.14 release
Severity: 5 - Major Priority: Normal
Resolution: None Assigned to: ralfbecker
Status: Closed Platform Version: Linux - Debian
Reproducibility: Every Time
Summary: Calendar planner locks up (or takes too long) in viewing a group's
schedule
Original Submission: I have a large default group with plenty appointments for
May,
it all works out until i hit the planner look and change to
the group through the js selectbox.
Im not shure it really crashes with an infinite loop or if
it just doesnt scale to the number of appointments in the
group (about 80-100)....
It dies with "Maximum execution time exceded 30 secs"
Follow-up Comments
*******************
-------------------------------------------------------
Date: 2002-Aug-31 17:48 By: ralfbecker
This has been corrected in CVS.
To grab a complete update of all fixes:
1) Check to see if you have cvs installed: 'cvs --help'.
1a) If not, install a copy of cvs-cli from your favorite
distro.
2) Then just type:
'cd <your phpgroupware dir>; cvs update -dP'.
You can do step 2 as many times in a day as you wish, and
will always get the most current bug fixes.
Thanks,
-------------------------------------------------------
Date: 2002-May-31 23:32 By: ralfbecker
i submitted a patch to skeeter, which corrects this (and lot more). The planner
is not realy working in 0.9.14
No files currently attached
For detailed info, follow this link:
http://savannah.gnu.org/bugs/?func=detailbug&bug_id=475&group_id=509