Dolibarr ERP & CRM » Bugs » bug #788
Date of linked interventions are not shownDernières modifications
Répondre
État Détails |
Submitted by: | Marcos García (marcosgdf) | | Submitted on: | 30/03/2013 15:11 |
Last Modified On: | 02/05/2013 13:57 | |
Summary: | Date of linked interventions are not shown |
Description: | When listing linked references to a project, table of interventions shows a date column, but no data is displayed in it |
Step to reproduce bug: | 1. Create a project
2. Create an intervention and link it to the project
3. Validate it
4. Go to the project and to "References" tab
5. See there's nothing in the date column |
Version: | 3.3.1 | | Category: | Module: Projects |
Severity: | 5 - Major | | OS Type/Version: | |
PHP version: | | | Database type and version: | |
Etat |
Status: | Open | | Assigned to: | HENRY Florian (fhenry) |
Resolution: | Fixed | |
Commentaires- HENRY Florian 02/05/2013 13:58
- The bug has been corrected. Pull request send inside GIT sources
(http://www.github.com/Dolibarr/dolibarr) and waiting to merge
into develop branch. - HENRY Florian 02/05/2013 13:57
- I put the validation date of intervention in this column
https://github.com/Dolibarr/dolibarr/pull/908
https://github.com/FHenry/dolibarr/commit/7e47b37adedeed0e58caf39251c667532b6bb63b
|
|
(http://www.github.com/Dolibarr/dolibarr) and waiting to merge
into develop branch.