Dolibarr ERP & CRM » Bugs » bug #788
Date of linked interventions are not shownLatest modifications
Answer now
Snapshot Details |
Submitted by: | Marcos García (marcosgdf) | | Submitted on: | 2013-03-30 15:11 |
Last Modified On: | 2013-05-02 13:58 | |
Summary: | Date of linked interventions are not shown |
Description: | When listing linked references to a project, table of interventions shows a date column, but no data is displayed in it |
Step to reproduce bug: | 1. Create a project
2. Create an intervention and link it to the project
3. Validate it
4. Go to the project and to "References" tab
5. See there's nothing in the date column |
Version: | 3.3.1 | | Category: | Module: Projects |
Severity: | 5 - Major | | OS Type/Version: | |
PHP version: | | | Database type and version: | |
Status |
Status: | Closed | | Assigned to: | HENRY Florian (fhenry) |
Resolution: | Fixed | |
Comments- HENRY Florian 2013-05-02 13:58
- The bug has been corrected. Pull request send inside GIT sources
(http://www.github.com/Dolibarr/dolibarr) and waiting to merge
into develop branch. - HENRY Florian 2013-05-02 13:57
- I put the validation date of intervention in this column
https://github.com/Dolibarr/dolibarr/pull/908
https://github.com/FHenry/dolibarr/commit/7e47b37adedeed0e58caf39251c667532b6bb63b
|
|
Open→ Closed