gluster-devel
[Top][All Lists]
Advanced

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: [Gluster-devel] 3.4 Beta Schedule?


From: Joe Julian
Subject: Re: [Gluster-devel] 3.4 Beta Schedule?
Date: Mon, 10 Dec 2012 11:10:53 -0800
User-agent: Mozilla/5.0 (X11; Linux x86_64; rv:17.0) Gecko/17.0 Thunderbird/17.0

Since EPEL upgraded to Folsom (breaking existing installs <grumble>...) I don't really see a point in spending any time on essex for the rpm based distros. Not sure about the dark side though.

On 12/06/2012 06:30 AM, Kaleb Keithley wrote:

From: "Vijay Bellur" <address@hidden>

- there's been a lot of work on UFO/gluster-swift - do you know if this will be 
included? Or will that be released separately on its own schedule?
The release can be done separately as the UFO/gluster-swift changes are
not dependent on a specific release of GlusterFS. Kaleb, your thoughts
on this?
Based on my email last week to this list and our scrum call this morning, we 
want to move to Folsom as soon as it's practical.

Our tentative plan is to jump to Openstack Swift Folsom (1.7.4). Shortly, we'll 
put a new UFO tarball up on download.g.o based on this.

Maybe we'll put up an intermediate tarball based on Essex (1.4.8) first?

As those happen I'll package them for Fedora 18, and in my repo for earlier 
versions of Fedora.

--

Kaleb

_______________________________________________
Gluster-devel mailing list
address@hidden
https://lists.nongnu.org/mailman/listinfo/gluster-devel




reply via email to

[Prev in Thread] Current Thread [Next in Thread]